Project

Primary power supply for a facility — 3600 kW

Two containerized diesel power plants with a combined capacity of 3600 kW for the primary power supply of a facility. Production, delivery and commissioning were completed.

Containerized diesel power plant for the primary power supply of a facility

Task

Provide the facility with a primary power supply with a combined capacity of 3600 kW.

Technology

Containerized diesel power generation.

Equipment

Two diesel power plants based on Mitsubishi engines. Combined electrical capacity: 3600 kW.

Operating mode

Primary power supply.

Result

The two power plants were manufactured, delivered and commissioned.
Solution
Primary power supply
Electrical output
3,600 kW