Equipment
Ancillary equipment and options
Fuel preparation, cooling, noise reduction, and containerization systems.
The performance of an energy center is determined not only by the main units: gas preparation, cooling, noise reduction, and layout affect equipment lifespan and operating conditions.
What's included
- — Gas preparation and fuel fittings
- — Cooling and ventilation systems
- — Noise reduction and site acoustic requirements
- — Containerized and modular block buildings
