Equipment

Ancillary equipment and options

Fuel preparation, cooling, noise reduction, and containerization systems.

The performance of an energy center is determined not only by the main units: gas preparation, cooling, noise reduction, and layout affect equipment lifespan and operating conditions.

What's included

  • — Gas preparation and fuel fittings
  • — Cooling and ventilation systems
  • — Noise reduction and site acoustic requirements
  • — Containerized and modular block buildings